Several motorway closures will affect Essex traffic this weekend, according to National Highways England.
These will mainly be along the A12 in the early hours of the morning, with a few on the Dartford Crossing and the M25.
If you are set to be travelling along these roads, it's best to take note of different diversions in place.
Get more great stories like this delivered to your inbox every day by signing up to our morning newsletter - don't miss out!
Here’s a list of all of the closures from Friday, January 26 to Sunday, January 28.
There will be a few closures on the A12 over the weekend in Essex (Image: PA)
M25, Dartford Crossing and A12 closures for Friday, January 26 in Essex
A12
On the A12 Southbound way, there will be a carriageway closure between Junction 16 and Junction 12 for reconstruction/renewal works from 8pm to 5am.
Meanwhile, on the Northbound way, there will be a 24-hour entry slip road closure at Junction 19 for New Beaulieu Station construction.
Elsewhere, there will be entry slip road closures at Junctions 14 and 15 on the Southbound way from 5am to 8pm during the day.
Dartford Crossing
The West tunnel on the Northbound way of the Dartford Crossing will be closed from 11pm to 5.30am for maintenance works.
M25
On the M25 clockwise way, there will be a carriageway closure between Junction 25 and Junction 26 for joint replacement works from 11pm to 6am.
The Junction 25 entry slip will also be closed during the same time period as part of this.
M25, Dartford Crossing and A12 closures for Saturday, January 27 in Essex
A12
On the A12 Southbound way, there will be a carriageway closure between Junction 16 and Junction 12 for reconstruction/renewal works from 8pm to 5am.
Meanwhile, on the Northbound way, there will be a 24-hour entry slip road closure at Junction 19 for New Beaulieu Station construction.
Elsewhere, there will be entry slip road closures at Junctions 14 and 15 on the Southbound way from 5am to 8pm during the day.
Dartford Crossing
The West tunnel on the Northbound way of the Dartford Crossing will be closed for maintenance works from 10pm until 5am.
M25
On the M25 clockwise way, there will be a carriageway closure between Junction 26 and Junction 27 for surfacing works from 10pm to 6am.
Alongside this the Junction 26 entry slip road will be closed during the same time period.
M25, Dartford Crossing and A12 closures for Sunday, January 28 in Essex
A12
On the A12 Northbound way from Junction 12 to Junction 15 there will be a carriageway closure for reconstruction/renewal works from 9pm to 5am.
Alongside that, on the Northbound way, there will be a 24-hour entry slip road closure at Junction 19 for New Beaulieu Station construction.
Elsewhere, there will be entry slip road closures at Junctions 14 and 15 on the Southbound way from 5am to 8pm during the day.
Recommended reading:
- Lower Thames Crossing 'will only relieve congestion for five years'
- Brentwood plan for huge logistics centre on former green belt
Dartford Crossing
The East tunnel on the Northbound way will be shut between 10pm to 5am for maintenance works.
M25
On the M25 clockwise way, there will be a carriageway closure between Junction 26 and Junction 27 for surfacing works from 10pm to 6am.
Alongside this the Junction 26 entry slip road will be closed during the same time period.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereLast Updated:
Report this comment Cancel