Live traffic & travel news for Aveley - Thurrock Gazette

  • Minimal

    A13 W/B: exit ramp to A1306 E/B closed.

    Exit ramp from A13 Westbound to A1306 Eastbound closed due to construction during the night. Starts at 16/09/2026 9:00 PM, ends at 17/09/2026 4:30 AM.

    Updated:

    Finish date: 17 September 2026 04:30

  • High

    M25 Dartford Tunnel: two lanes closed from M25 to M25

    Two lanes closed due to construction during the night on M25 Dartford Tunnel anticlockwise from J1A A206 (Dartford) (Swanscombe) to J31 A1306 (Lakeside / Purfleet). Detour in operation - via the right-hand tunnel. The J1A anti-clockwise entry slip road is also closed. Starts at 16/09/2026 9:00 PM, ends at 17/09/2026 4:30 AM.

    Updated:

    Finish date: 17 September 2026 04:30

  • Severe

    M25: road closed at J30 A282 (Lakeside / Purfleet)

    Road closed due to construction during the night on M25 clockwise at J30 A282 (Lakeside / Purfleet). Detour in operation - via the slip roads. Starts at 16/09/2026 9:00 PM, ends at 17/09/2026 4:30 AM.

    Updated:

    Finish date: 17 September 2026 04:30

  • Minimal

    A13 E/B: entry ramp from A1089 N/B closed.

    Entry ramp to A13 Eastbound from A1089 Northbound closed due to construction during the night. Starts at 16/09/2026 9:00 PM, ends at 17/09/2026 4:30 AM.

    Updated:

    Finish date: 17 September 2026 04:30

  • Minimal

    Grays End Close: gas main work at Hogg Lane

    Gas main work on Grays End Close both ways at Hogg Lane. Starts at 11/09/2026 6:52 AM, ends at 07/10/2026 11:00 PM.

    Updated:

    Finish date: 7 October 2026 23:00

  • Minimal

    Brentlands Drive: gas main work between Brent Lane and Marina Drive

    Gas main work on Brentlands Drive both ways between Brent Lane and Marina Drive. Starts at 07/09/2026 6:39 AM, ends at 04/10/2026 11:00 PM.

    Updated:

    Finish date: 4 October 2026 23:00

  • Minimal

    Lingfield Avenue: gas main work at B2500 Watling Street

    Gas main work on Lingfield Avenue both ways at B2500 Watling Street. Starts at 21/08/2026 4:56 PM, ends at 17/09/2026 11:00 PM.

    Updated:

    Finish date: 17 September 2026 23:00

  • Low

    Romford Road: water main work at Shannon Way

    Temporary traffic signals due to water main work on Romford Road both ways at Shannon Way. Starts at 25/08/2026 7:10 AM, ends at 11/10/2026 11:00 PM.

    Updated:

    Finish date: 11 October 2026 23:00

  • Low

    Colyers Lane: road closed between Swallow Close and the school

    Road closed due to water main work on Colyers Lane both ways between Swallow Close and the school. Starts at 05/08/2026 9:00 AM, ends at 17/10/2026 4:00 PM.

    Updated:

    Finish date: 17 October 2026 16:00

  • Low

    Chequers Lane: construction at Messina Way

    Temporary traffic signals due to construction on Chequers Lane both ways at Messina Way. Starts at 27/04/2026 8:30 AM, ends at 23/10/2026 5:00 PM.

    Updated:

    Finish date: 23 October 2026 17:00

  • Minimal

    Church Hill: road permanently closed from Charles Street to Elizabeth Street

    Road permanently closed due to new road layout on Church Hill both ways from Charles Street to Elizabeth Street. Starts at 15/04/2024 2:51 PM, ends at 15/04/2027 4:19 PM.

    Updated:

    Finish date: 15 April 2027 16:19

Information provided by INRIX