Search for more Public Notices in your area
Highways England
Traffic

THE M25 MOTORWAY, A282, A13 AND A1089 TRUNK ROADS NEAR BRENTWOOD AND THURROCK TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MF0215354

Notice effective from
11th May 2017 to 10th June 2017

THE M25 MOTORWAY, A282, A13 AND A1089 TRUNK ROADS NEAR BRENTWOOD AND THURROCK TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited has made an Order on the M25 Motorway, and the A282, A13 and A1089 Trunk Roads in the County of Essex, the Unitary Authority of Thuirock, and the London Borough of Havering, under Section 14(1 )(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order is to:-
a) authorise the phased overnight closure of;

i) both carriageways of the M25 between Junction 28 (Brook Street Interchange) (A12) and Junction 29 (Cranham Interchange) (A127);

ii) the westbound carriageway of the A13 between the exit and entry points of the link roads to and from the A1089 at Baker Street Interchange (A1089);

iii) the eastbound carriageway of the A13 between the exit and entry points of the link roads to and from the A1089 at Baker Street Interchange (A1089);

iv) both carriageways of the A1089 between Marshfoot Interchange (A126) and Asda Roundabout;

v) the westbound carriageway of the A13 between the exit and entry roads at Wennington Interchange (A1306);

vi) the road leading to the clockwise carriageway of the M25 at Junction 28 (Brook Street Interchange) (A12);

vii) the road leading from the anti-clockwise carriageway of the M25 at Junction 28 (Brook Street Interchange) (A12);

viii) the road leading from the clockwise carriageway of the M25 at Junction 29 (Cranham Interchange) (A127);

ix) the road leading to the anti-clockwise carriageway of the M25 at Junction 29 (Cranham Interchange) (A127);

x) the road leading from the northbound carriageway of the A1089 at Marshfoot Interchange (A126);

xi) the road leading to the southbound carriageway of the A1089 at Marshfoot Interchange (A126);

xii) the road leading from the westbound carriageway of the A13 at Wennington Interchange (A1306); and

xiii) the road connecting the roundabout at Mar Dyke Interchange (M25 Junction 30) (A13) to the roundabout at Purfleet Interchange (M25 Junction 31);

b) impose an overnight 50mph speed limit on;

i) both carriageways of the M25 and the A282 between Junction 27 (M11 Junction 6) and Junction 31 (Purfleet Interchange) (A1306);

ii) the roads leading to the clockwise carriageway of the M25 from the M11 at Junction 27 (M11 Junction 6);

iii) the roads leading to both carriageways of the M25 at Junction 28 (Brook Street Interchange) (A13);

iv) the roads leading to both carriageways of the M25 at Junction 29 (Cranham Interchange) (A127);

v) the road leading to the anti-clockwise carriageway of the M25 at Junction 30 (Mar Dyke Interchange) (A13);

vi) the road connecting the roundabout at Mar Dyke Interchange (M25 Junction 30) (A13) to the roundabout at Purfleet Interchange (M25 Junction 31); and

vii) the road connecting the road described in b) vi) above to the clockwise carriageway of the A282 Trunk Road at Mar Dyke Interchange (M25 Junction 30) (A13).

The speed limit will operate during lane closures, and at such times as appropriately notified by signs, the provisions of Regulation 12 of the Motorways Traffic (England and Wales) Regulations will be suspended insofar as they relate to a vehicle being driven in the right hand lane of the carriageways described in b) i) above. These measures are in the interests of road safety while contractors undertake resurfacing, road marking, studs and loops replacement, bridge maintenance, carriageway and structural inspections, all associated work and all routine maintenance.
It is expected that the work will last for approximately 7 days starting on
or after Monday 22nd May 2017. The overnight closures will take place
between (maximum period) -
20:30 - 05:30 hours Monday - Thursday
21:00 - 06:00 hours Friday
20:30 - 05:00 hours Saturday
20:30 - 05:30 hours Sunday
The Order will come into force on 20 May 2017 and have a maximum
duration of eighteen months.
Traffic affected by the closures in;
a) i) above will be diverted using the A12 and A127;
a) ii) above will be diverted southbound on the A1089 to Asda
Roundabout and return; a) iii) above will be diverted southbound on the A1089 to Marshfoot
Interchange (A126) and return; a) iv) above will be diverted using the A126 and Dock Road; a) v) above will be directed to leave the carriageway and re-join; a) xii) above will be diverted westbound to Ferry Lane Interchange
and return; and
a) xiii) above will be diverted westbound on the A13 to Wennington Interchange (A1306) and return using the A1306 to M25 Junction 31 (Purfleet Interchange) (A282/A1306).
All other closures will use alternative junctions on the M25 and return.
The temporary closures, speed restriction, and diversion routes will be
clearly indicated by traffic signs when they are in operation during the
works period.
M Taylor, an Official of Highways England Co Ltd. Ref: HE/SE/2017/M25/65
an Official of Highways England Co Ltd. Ref: HE/SE/2017/M25/65
Highways England Company Limited, (Company No. 9346363).
Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey,
GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on
0300 123 5000 or info@highwaysengland.co.uk
http://www.highways.gov.uk

Attachments

MF0215354.pdf Download

Comments


or Register to leave a comment and/or receive comment alerts.

Related notices

Thurrock Gazette